Pre-installed floor slabs must be installed in a floor space of 48 hours in order to allow the floor to adapt to the temperature of the construction site and to be more stable after construction.
In order to make the construction process more convenient, we have to prepare the following necessary materials and tools: Measuring tools, cutters, saws, cutters, adhesive tapes, glues and tools other.
Measure and calculate carefully to minimize wastage of materials and save time during construction.